Freight moved.
Infrastructure built.

Sibambo (Pty) Ltd runs two divisions from one operation: road freight and warehousing across South Africa, and civil and building construction for private and public clients.

Why clients stay

Most of what goes wrong on a job is not the work. It is not being told.

A late load, a site standing idle, a bill nobody warned you about. We built the way we run around removing those three, because they are what cost you money long after the job is done.

01

One number, one answer

You speak to the person who knows your job. Not a call centre, not a ticket number, not a different voice every time you phone.

02

You see the plan first

Before anything moves or breaks ground you get it in writing. Scope, resources, dates and price. If it changes, you hear it from us before you see it on an invoice.

03

Bad news travels fast

A truck breaks down, rain shuts a site. You get the call that day with what we are doing about it, not a surprise at month end.

04

Two divisions, one programme

When the trucks and the crew answer to the same operations desk, the delivery gets planned around the site instead of against it.

Our divisions

Two operations. One company answering for both.

Forklift moving pallets down the aisle of a distribution warehouse Division 01

Logistics

Getting goods from where they are to where they are needed, on a date somebody can hold us to. We plan the route, we carry the load, and we tell you where it is when you ask.

  • Full load and part load road freight, nationwide
  • Container movement between the ports and inland
  • Warehousing, storage and stock handling
  • Site deliveries of plant, material and equipment
  • Scheduled distribution runs on a fixed cycle
Logistics services
A construction crew and a yellow excavator working on a site in South Africa Division 02

Construction

Civil and building work delivered to a programme, with the site kept safe and the client kept informed. The same operations desk that runs the trucks runs the material to the site.

  • Civil works: earthworks, roads, stormwater and reticulation
  • Building works: structures, brickwork, roofing and finishes
  • Refurbishment, alterations and maintenance contracts
  • Site establishment, plant hire and materials supply
  • Subcontract packages for main contractors
Construction services

Why both under one roof

The delay is almost never the truck. It is the handover.

On most jobs the transporter and the contractor work for different companies. Neither one owns the gap between them. The load lands on a site that is not ready, or the crew stands around waiting for material that left late, and each side has a reasonable explanation.

We took that gap out by keeping both divisions in one business. One operations desk plans the delivery and the site work against each other, so a change on one side moves the other side the same day.

It also means one contract, one invoice and one person to hold responsible when something slips. You are not the one carrying messages between two suppliers.

How we work

From enquiry to done

Four steps, and you know where you stand at each one

You tell us the job

The load, the site or the scope. A phone call is enough to start. We ask the questions that decide the price rather than sending a form back.

We put it in writing

A written plan and a fixed price where the scope allows one. What is included, what is not, and what would change the number.

We do the work

One contact who knows your job. Updates while it runs, and a call the same day if anything moves, whether that suits us or not.

We close it out

Proof of delivery or a completed handover, then an invoice that matches the quote you approved. No line items you have not seen before.

Tell us what needs to move, or what needs to be built

Send the load, the site or the scope. You get a written plan and a price, not a callback promise.